For all Your Engineering Solutions


ICB Design & Engineering Ltd

Latest Projects

Recently, Mace the company to build the Shard in London,The tallest building in Europe, Brought together RBG (Robert Bird Group) to design FLG were then awarded the contract and then ICB to manufacture.

RBG (Robert Bird Group) role was to design a moving platform system for the HSBC tower in London’s Canary Wharf. The moving platform will be a temporary structure and will be used for maintenance on the upper five levels of the tower.

ICB’s role was to produce fabrication drawings and to manufacture. The platform consists of top and bottom rails all individual sections and five tap units over eleven metres long… Read More …

Bidwell Metals

Conveyors, Disc screen

St Georges wharf Crane Ties

HSBC Canary Wharf

Latest News

Lomac

Drum air separator